2008-2013깤ҵ

 

2008.6 60/״Ŀ 600,000 tons / year methanol project
1/2″-6″޷    0Cr25Ni20
2008. 11 100/ϩĿ Tianjin 1 million tons/year ethylene project
1/4″-72″޷ 0Cr18Ni9  0Cr17Ni12Mo2 
2009.01 񻪰ͷúúĿշװ 
1/2″-14″޷  06Cr19Ni10  022Cr17Ni12Mo2
2009.01 úúϩĿ Shenhua better coal group coal base olefin project  
1/2″-16″޷ܡ   06Cr19Ni10  
2009.02 տƹĿ Zhanjiang Dongxing Refining a complete set of project
3/4″-20″޷  0Cr18Ni9  00Cr17Ni14Mo2
2009.02 άĿ Cellulose Acetate Project
1/2″-24″޷  0Cr18Ni9  0Cr25Ni20
2009.02 񻪰ͷúϩĿװ 
1/2″-20″޷ܡֹܼ   06Cr19Ni10  022Cr17Ni12Mo2
2009.03 úúϩĿ Shenhua better coal group coal base olefin project  
3/4″-12″֡Ͻ֡˫ֹܼ  0Cr25Ni20  2205
2009.06 100/ϩ̻/Ҷװ
2″-20″ (XS-S=28.58mm)޷ܣ304/304Lֹܼ
2009.05 6/ϩ 60000ton/year of Acrylic Type
1/2″-16″ֹܼ޷  0Cr18Ni9  0Cr17Ni12Mo2 
2009.05 LNGĿ LNG project
1/2"-10"޷ܡ   06Cr19Ni10  022Cr19Ni10
2009.06 100/ϩ 45/ϩװϵͳ 
1/2"-24"޷ܺͷ   06Cr19Ni10  022Cr19Ni10
2009.06 ʯʯ10־۱ϩĿ Qingyang Petrochemical 100,000tpa PP project
1/2"-20"޷ܡֹ   0Cr25Ni20
2009.06 100/ϩ 1,000,000tpa ethylene project
2"-12"޷  0Cr18Ni9  00Cr17Ni14Mo2
2009.06 úҵ83/һڹ 
14"-36"޷ܡֺ
2009.12 ״ϳɼܼĿ Methanol synthesis and the tank tube project
1/2"-28"޷ܡ  0Cr18Ni9  00Cr17Ni14Mo2
2010.01 ԭʻƷĿ Poor quality of crude oil, fuel quality upgrading project
1/2"-18"Ͻֹ̼ܼ֡
2010.01 úúϩĿ Shenhua better coal group coal base olefin project  
4"-28"Ͻ˫ֹֺܼ  06Cr19Ni10
2010.01 úúϩĿ Shenhua better coal group coal base olefin project  
3/4"-8"ֹܼ  06Cr19Ni10
2010.02 йʯ͸˳ʯ80/ϩ 
1/2"-22"޷ܡ   06Cr19Ni10  022Cr19Ni10
2010.03 30/ϩ 300,000 tons of vinyl acetate-year project
1/2"-32"ֹܼ   06Cr19Ni10  0Cr25Ni20
2010.04 ʯʹع̽ĿNational oil reserve base construction project
2"-16"޷ܡܼ    0Cr25Ni20
2010.05 Խ(úͷ)Ŀ Ninh Binh Fine Coal Based Urea Plant
2"-12"  SCH10-SCH80޷  0Cr18Ni9  00Cr17Ni14Mo2
2011.07 кʯ˾20ϩἰĿ 
12"-48" (SCH10S-SCH40S)޷ֺӹܼ 
2011.07 ֲ޹˾6/껷Ŀ 
1/2"-28" (SCH10S-SCH40S)ֹܼ޷  0Cr25Ni20
2011.07 úúϩĿ Shenhua better coal group coal base olefin project
Φ97-Φ182 (S=3mm-S=4mm)޷ܡܼ  06Cr19Ni10  022Cr19Ni10
2011.08 ½컪ú55/úȻĿ 
1/2"-28" (SCH10S- SCH80)޷ܡֺܡ   06Cr19Ni10  022Cr19Ni10
2011.11 260/ͼ⾫Ŀ
1/2″-20″ (SCH100)ѹ321޷    06Cr19Ni10 
2011.11 ճάĿ Daily inspection maintenance project  
1/2"-24" (SCH20S-SCH80޷ܡֹܼ  06Cr19Ni10  022Cr19Ni10
2011.11 1-4Ŀ 1-4 butyl glycol project
4"-36" (SCH20-SCH100)޷ܡֺܡܼ   304  321 
2011.12 ͸ѹĿ Refinery expansion project often decompression
2"-24" (SCH20-SCH40)޷ܡֹܼ    06Cr19Ni10  022Cr19Ni10
2012.01 ͸򻯹Ŀ 
3/4"-44" (SCH10S/150LB)  304L޷ܡֺ
2012.07 ӳúԴ޹˾ӳ60/DMTOĿ  
2"-16" (SCH20-SCH40S)ֹܼ޷  06Cr19Ni10  022Cr19Ni10
2012.07 Դۺòҵ԰Ŀ
1/2"-72"(SCH20-SCH80)޷ܡ  06Cr19Ni10  022Cr19Ni10
2012.08 ˹̹ͳι˾Ŀ 
8"-24" SCH20-SCH40޷ܡֺ     022Cr19Ni10
2012.01 ʽLNGնĿ Tianjin floating LNG receiving terminal project
1/2"-12" (SCH10S-SCH80)  304/304L޷
2012.01 麣̱ٻ޹˾PTAĿ
2"-18"  (SCH10S-SCH140)˫޷ܼ  ޷ 06Cr19Ni10  022Cr19Ni10
2012.01 9ֶĿ 90000 tons of butyl project  
2"-16" (SCH10S-XS)˫಻޷  06Cr19Ni10  022Cr19Ni10
2012.11 ɽ̩60/LNGװĿ   
1/2"-44" (SCH10S-SCH60)²ֹܣ304/304L316/316L
2012.11 ԽϱĿ 
1/2"-32" (SCH30-XXS)  ޷  304  321 
2012.11 ԽϱĿ
1/2"-12" (SCH20-SCH40S) ˫಻޷   06Cr19Ni10  022Cr19Ni10
2012.11 úԴ޹˾״ϵӹۺĿ 
1/2"-40" (S=5.5mm-S=24mm)޷ܡֺܼܼ   06Cr19Ni10  022Cr19Ni10
2013.01 úԴ޹˾״ϵӹۺĿ 
24" (SCH80)  ޷ܺͺ  304  321  317L
2013.01 麣̱ٻ޹˾PTAĿ 
3/4"-40"  (SCH10S-SCH160) ޷ܡֺ   06Cr19Ni10  022Cr19Ni10
2013.03 ˶˷޹˾10ʪᾫĿ 
˫಻ֹܼ31803904L޷ 76*3  
2013.03 йʯȻɷ޹˾ɽLNGĿվ 
8"-12" (SCH10S-SCH100)޷ 304/304L
2013.03 ú14-Ŀڹ 1, 4 - butanediol crane coal project phase ii project
1/2"-14"  ֹ  06Cr19Ni10  022Cr19Ni10